FabDashboardSemi Intelligence
Demo Data — MVP
OVERVIEW
  • Dashboard
  • Executive Briefing
FOUNDRIES
  • All Companies
  • TSMC
  • Intel Foundry
  • Samsung Foundry
  • GlobalFoundries
  • SMIC
  • Terafab
OPERATIONS
  • Intel Operations
  • Intelligence Feed
  • Bottleneck Index
  • Dependencies
  • Change Tracker
  • Review Queue
  • Search
STRATEGIC
  • Risk Model
  • Scenarios
  • Power & Energy
INTELLIGENCE
  • AI Infrastructure
  • Node Tracker
  • AI Chips
  • Packaging
  • Datacenters
  • Timeline
  • Supply & Demand
  • Global Map
  • Supply Chain
PLATFORM
  • About
  • Methodology
  • Sources
  • Glossary

FabDashboard v0.1 MVP
Data is illustrative only.
Not for investment use.

FabDashboardTechnology Timeline
⚠Demo Data
⚠DEMO DATA — All figures are illustrative estimates only. Not for investment, trading, or business decisions.

Technology Timeline

Key milestones across fabs, process nodes, AI chips, and advanced packaging. 2022–2027 semiconductor roadmap.

Timeline milestones are sourced from public company announcements, earnings calls, and analyst estimates. Future milestones (2025+) are illustrative estimates. Dates labeled [est.] are not confirmed. Not for investment decisions.

17

Total Milestones

8

Completed

8

On Track / Future

1

Delayed

0

Speculative

Milestone Grid

DEMO
2022
2023
2024
2025
2026
2027
NOW

Fab

Samsung Taylor Fab (Texas)

Taylor Fab Construction

AI Chip

NVIDIA H100 SXM5

H100 General Availability

Process Node

TSMC N3

N3 Mass Production

Process Node

TSMC N3E

N3E Mass Production

Packaging

CoWoS-L

CoWoS Supply Constraint

Fab

TSMC Fab 21 Ph2 (Phoenix)

Fab 21 Ph2 Construction

AI Chip

AMD MI300X

MI300X General Availability

Packaging

HBM3e Stack

HBM3e Ramp for Blackwell

Process Node

Samsung SF3E

SF3E Mass Production

Fab

TSMC Fab 21 Ph1 (Phoenix)

Fab 21 Ph1 Ramping

AI Chip

NVIDIA H200 SXM5

H200 General Availability

Process Node

TSMC N2

N2 Mass Production

AI Chip

NVIDIA B200/GB200

Blackwell Production Ramp

Process Node

Intel 18A

Intel 18A Risk Production

Fab

Intel Fab 52/62 (Chandler)

Intel 18A Production Ramp

Process Node

TSMC N2P

N2P Mass Production

Completed
On Track
Delayed
Speculative
Hover events for detail

Chronological View

17 milestones
FabSamsung Taylor Fab (Texas)
2022CONF

Taylor Fab Construction

Samsung Taylor TX fab breaks ground. $17B CHIPS Act investment.

Completed[Samsung Press Release 2022]
AI ChipNVIDIA H100 SXM5
2022CONF

H100 General Availability

NVIDIA H100 SXM5 enters general availability. Transforms AI training market.

Completed[NVIDIA GTC 2022]
Process NodeTSMC N3
2022CONF

N3 Mass Production

TSMC N3 FinFET enters mass production. Apple A17 lead customer.

Completed[TSMC Q4 2022 Earnings]
Process NodeTSMC N3E
2023CONF

N3E Mass Production

Enhanced N3E — improved yield, better PPA. Main N3-family volume node.

Completed[TSMC Q2 2023 Earnings]
PackagingCoWoS-L
2023HIGH

CoWoS Supply Constraint

TSMC CoWoS-L identified as key constraint limiting AI GPU supply growth.

On Track[TSMC Earnings / Supply Chain Reports 2023]
FabTSMC Fab 21 Ph2 (Phoenix)
2023HIGH

Fab 21 Ph2 Construction

TSMC Arizona Phase 2 (N2) construction begins. $13B investment.

Completed[TSMC investor presentation 2023]
AI ChipAMD MI300X
2023CONF

MI300X General Availability

AMD MI300X with 192GB HBM enters GA. Strong inference competitor to H100.

Completed[AMD Financial Analyst Day 2023]
PackagingHBM3e Stack
2024MED

HBM3e Ramp for Blackwell

SK Hynix HBM3e ramp prioritized for NVIDIA Blackwell. Tight supply 2024–2025.

On Track[SK Hynix Q3 2024 Earnings]
Process NodeSamsung SF3E
2024MED

SF3E Mass Production

Samsung 3nm GAA (SF3E) volume ramp. First GAA node in mass production industry-wide.

On Track[Samsung Foundry Forum 2023]
FabTSMC Fab 21 Ph1 (Phoenix)
2024CONF

Fab 21 Ph1 Ramping

TSMC Arizona Fab 21 Phase 1 (N4P) enters production ramp.

Completed[TSMC Q1 2024 Earnings]
AI ChipNVIDIA H200 SXM5
2024CONF

H200 General Availability

H200 (H100 die + HBM3e) enters GA. Key memory capacity uplift for LLMs.

Completed[NVIDIA SC23]
Process NodeTSMC N2
2025HIGH

N2 Mass Production

TSMC's first GAA (nanosheet) node at 2nm-class. Apple A20 lead customer.

On Track[TSMC OIP 2024 / Analyst Consensus]
AI ChipNVIDIA B200/GB200
2025HIGH

Blackwell Production Ramp

GB200 NVL72 rack begins shipping to hyperscalers. CoWoS supply key constraint.

On Track[NVIDIA GTC 2024 / Q3 2024 Earnings]
Process NodeIntel 18A
2025MED

Intel 18A Risk Production

Intel 18A RibbonFET + PowerVia enters risk production phase. CHIPS Act milestone.

On Track[Intel Investor Meeting Q4 2024]
FabIntel Fab 52/62 (Chandler)
2025MED

Intel 18A Production Ramp

Intel Chandler fabs targeting Intel 18A production ramp. CHIPS Act beneficiary.

On Track[Intel Investor Meeting 2024]
Process NodeTSMC N2P
2026MED

N2P Mass Production

N2P — backside power delivery rail option (BSPDN). Performance uplift.

On Track[TSMC Technology Symposium 2024]
FabTSMC Fab 21 Ph2 (Phoenix)
2028LOW

Fab 21 Ph2 Target Ramp

N2 production ramp target. Delayed from original 2026 target. [est.]

Delayed[Industry Analyst Reports 2024]

* All future dates are illustrative estimates. Sources noted per milestone. Delayed = behind original schedule per public reporting. Not for investment use.